
Services
Installation
Our crews install on an agreed sequence, coordinated around your build program and your opening date.
Around your program, not instead of it
Install is scheduled against the rest of the construction program — flooring, electrical and inspection dates — so the attraction is not the thing that moves your opening.
An empty shell and a trading venue are two different jobs. In a shell the sequence runs against the other trades. In a park that is still taking money, the work happens around opening hours, behind a barrier, and the measure of it is how little a visitor on the same day notices.
Either way the crew works to the approved drawing set, and installs safely, correctly, and in compliance with the applicable safety standards — which is the part your inspector and your insurer will ask about afterwards.


Who is actually in the building
Installation is where a design stops being a drawing, and the people doing it are the last ones who can catch something. Ours hold ongoing training through eight bodies, and these certifications between them.
Certifications held
- ASTM Active Committee Member — F24: Amusement Rides and Devices
- ASTM Active Committee Member — F08: Sports Equipment, Playing Surfaces, and Facilities
- AIMS International: Adventure Attractions Certification Level I
- AIMS International: Trampoline Devices
- Amusement & Adventure Institute (AAI): Trampoline Court Training Inspection Course Level I
- International Adventure & Trampoline Park Association (IATP) Committee Member
- ACCT Member
- NAARSO Member
Trained through
- Amusement & Adventure Institute (AAI)
- ASTM International
- Association for Challenge Course Technology (ACCT)
- American National Standards Institute (ANSI)
- International Adventure & Trampoline Park Association
- International Association of Amusement Parks and Attractions
- Amusement Industry Manufacturers & Suppliers International
- National Association of Amusement Ride Safety Officials
Two of those are worth more than the rest put together on a page about who turns up. F24 is the ASTM committee that writes the trampoline court standard, and F08 covers playing surfaces. Sitting on the committee that writes the rule is a different relationship with it from reading the rule once it is published.
Three that are on the record
Whimzy, Cartersville GA
Baby and toddler soft play, a twin Valo Jump, a larger soft play frame and a Rugged Interactive multi-sports pitch — design, manufacturing and installation under what the write-up calls really tight deadlines.
Read the write-upAltitude, West Palm Beach FL
A fifth park for a long-standing client, where the new padding and mats were provided and installed to match the rest, so the finish reads as one room rather than as an addition.
Read the write-upAltitude, Odessa TX
A Valo Jump and a Strike Arena into a trading park, installed with the manufacturing partner who built them. The park kept its customers afterwards, with new competition nearby.
Read the write-up


Either side of the install
4 pages

Manufacturing
Built in our own production process and checked against certified standards before any of it ships to site.

Inspections & Compliance
The documentation your inspector, your insurer and your local authority ask to see before you open.

Maintenance
Parts, service calls and scheduled maintenance from a US-based team, for the life of the attraction.

Upgrades & Retrofits
Refresh a tired mix, add an attraction, or re-plan a floor that is not earning — inside the building you already have.
The next step
Send the building, get a line-item estimate
Footprint, ceiling height and opening target is enough to start. You get a priced scope, not a brochure.
Talk to somebody
864-477-1126Request an EstimateOr send a floor plan and we will come back with a priced scope.
