NOW PLANNING PARK PROJECTS FOR 2027

Equipment

Equipment built for commercial operation

Ten attraction categories, sorted here by what each one asks of your building rather than alphabetically — because the floor you can give and the height above it decide most of the shortlist before taste does.

Three groups

What your building will let you have

Every structure is designed for the footprint it is going into: columns, ceiling heights, sprinkler layouts and mezzanines are constraints to design around, not reasons to start again.

  1. Spends floor

    Low ceiling is fine

    Ground-level attractions that need area rather than air. These are what a room with a nine-foot ceiling can still have, and they are the parts of a park that can be added later without touching the structure. Soft play · Sport courts · Party & F&B zones · Inflatables & airbags · Interactive attractions

  2. Buys floor back

    Needs height

    Attractions that use the volume above the footprint, which is the cheapest square footage in any building because the rent on it is already paid. All of them have a clear-height question before they have a price. Climbing & ropes · Slides · Indoor zip lines · Ninja & obstacle courses

  3. Wants both

    Floor and air

    Trampoline equipment is the one category that asks for a large open floor and serious height at the same time, which is why a trampoline park is the hardest of these buildings to find and the most specific to fit out. Trampoline equipment

The grouping is ours. Which of them belongs in your room is a question about the operator as much as the building — industries sorts that by who is watching and how long they stay — and how much floor each one should take is a planning exercise with its own guide.

Four measurements

Take these before you shortlist anything

Our own design guide asks for a space assessment before anything is drawn — ceiling height, obstacles, entry and exit points — because that determines the size and type of equipment a room can accommodate at all. The four beside this are the version of that list a supplier actually needs from you.

The first is the one that disqualifies. Clear height is measured under the lowest obstruction rather than to the roof, and it is the one number a landlord cannot change for you. Everything in the second group above has a clear-height question before it has a price.

The last is the one people forget. A structure arrives in sections and has to come through a door; access is why an installation that looked simple on a drawing becomes a Sunday night crane booking. The design guide is the order to make the rest of the decisions in, and design is where they become a drawing.

Clear height
Under the lowest obstruction, not the roof
Columns
Where they are, and what they take out of the plan
Obstructions
Sprinklers, ducts and lighting, with their drop
Access
The door a structure comes through, in sections

Four numbers and a photograph of the door is enough to start a conversation that is not guesswork.

Send them and get a layout

What everything here is built to is on safety and standards, how it is made is manufacturing, what it costs to keep is maintenance, and what the room has to earn to justify any of it is the payback calculator.

The next step

Send the building, get a line-item estimate

Footprint, ceiling height and opening target is enough to start. You get a priced scope, not a brochure.

Talk to somebody

864-477-1126Request an Estimate

Or send a floor plan and we will come back with a priced scope.