NOW PLANNING PARK PROJECTS FOR 2027

Services

Design, manufacture, install and support

Nine services, and the useful thing to know first is that four of them happen before a park opens and five of them start the day it does. Most manufacturers' websites stop at the fourth.

Before it opens

Four stages between a building and an opening date

Most operators arrive with a building and a date. What they need is a priced scope, a drawing set an authority will pass, equipment that ships when it should, and a crew that installs around the rest of the build.

  1. Consulting

    Before

    Whether the building works at all, and whether the catchment supports what you want to put in it. The cheapest stage to find out that the answer is no.

  2. Design

    Before

    A measured layout and a 3D model of your room, refined until it meets the specification and the standards. Changes here cost a revision rather than a reinstall.

  3. The drawing becomes steel, padding and netting, built to EN, ASTM and ISO standards with quality checks before any of it leaves for site.

  4. Installation

    Before

    Scheduled against the rest of the construction program — or, in a park that is still trading, around opening hours and behind a barrier.

The principles that run through all four are the client's own, from their account of how they design: innovation, engagement and safety, in that order. The people who do it are on the team page, which also carries the committee seats and certifications.

One point of responsibility

The whole project under one name, which is their claim

Specialist partners handle some of the work and Next Level Parks stays accountable for all of it. That is the claim this section is built on, and it is worth reading precisely: accountability for everything is not the same as doing everything, and a supplier who says so is easier to compare than one who implies otherwise.

What follows from it, for a reader: ask which parts are in-house and which are partnered, and ask who holds the contract for each. This site does not list which is which, because we do not have that from the client — the case studies name partners where the write-ups name them, and nowhere else.

From opening day

Five services that start when the build finishes

This is the half that decides whether the first four were worth it, and it is the half most manufacturers' websites leave out.

  1. The routine that decides whether equipment reaches the ten years our own writing claims for it. Pads, netting, vinyl and fasteners are wear items on a schedule, not surprises.

  2. The paperwork an insurer and an inspector ask for, kept current rather than assembled in a panic. Four people will ask, at four different moments.

  3. Marshals who can see the whole court, an evacuation that has been rehearsed, and a consistent answer at the counter about what the equipment is built to.

  4. What happens when the mix stops earning. Every one of our six case studies is this service rather than a new build.

  5. Financing

    After

    The capital side, including the routes our own guides set out — SBA, equipment financing, and the thresholds a lender will check before any of them.

The costs that close a park are almost all on this side of the line: the lease, the utilities, the insurance and the upkeep are paid every month for as long as the business exists, while the build is paid once. The cost guides set that out properly, the payback calculator lets you put your own figures against it, and the guides are the long form of everything above.

The next step

Send the building, get a line-item estimate

Footprint, ceiling height and opening target is enough to start. You get a priced scope, not a brochure.

Talk to somebody

864-477-1126Request an Estimate

Or send a floor plan and we will come back with a priced scope.