NOW PLANNING PARK PROJECTS FOR 2027

Industries

Adventure parks

The format with no single anchor: trampolines, climbing, ninja, interactive and soft play in one building, where the mix is the product and the reinvestment is the business model.

The format

A park defined by its mix rather than its anchor

Our own writing defines the format in one sentence: high-energy activities for visitors of all ages, typically featuring trampoline courts, air bags, foam pits, climbing walls, obstacle courses, zip lines, arcades, playgrounds, bumper cars and the latest in VR, MR and AR — with a focus, in the same sentence, on fun, fitness and adventure.

That is a list rather than a product, which is exactly the point. A trampoline park has an anchor and sells around it. An adventure park is the mix, so the questions that decide whether it works are about how the attractions sit together — and those are the questions the next band answers, in our own words.

It is also why this format ages differently. Nothing here is one purchase that lasts twenty years; it is eight or ten purchases on different clocks, which is a maintenance brief as much as a design one.

  • Trampoline courts
  • Air bags and foam pits
  • Climbing walls
  • Obstacle courses
  • Zip lines
  • Arcades and playgrounds
  • Bumper cars
  • VR, MR and AR

The list is from our own piece on maintenance and inspections in trampoline and adventure parks, which is addressed to this format by name — as is the attraction-mix guide the next band comes from.

Four rules

How our own guide says to put a mix together

Written for this reader specifically, and the most practical thing we have published about planning a room. Four rules, in their order.

  1. Zone it

    By age

    A toddler zone, a family zone and a thrill zone, kept apart on purpose. Our own guide adds the operational reason: a soft play area keeps younger children away from the main court, which prevents injuries as well as arguments.

  2. Build upward

    Vertical space

    Climbing walls, slides, multi-level soft play and arena structures use the volume a building already has. In a format defined by how much it fits in, that is the difference between a full room and a crowded one.

  3. Pair what complements

    Throughput

    Our guide gives two worked examples: a strike arena next to a sports court for events, and slides, zip lines and ninja courses sharing airbag landings — which it credits with lifting throughput and safety together.

  4. Keep some of it rentable

    Flexibility

    Choose attractions that adapt. A strike arena and a sports court can be let for private parties, which is how a park sells the same hour twice and fills the weekday it would otherwise give away.

All four are from the attraction-mix guide, which goes on to cover theming, programming and food and beverage. Turning them into a floor plan is what design does.

AirFX, Iowa

Successful owners reinvest, and here is what that looked like

The opening line of our own case study at AirFX in Hiawatha, Iowa is the business model of this format in one sentence: successful adventure park owners consistently reinvest in their parks, enhancing amenities and adding new attractions. AirFX is a park with trampolines, foam pits, soft play, ninja courses, climbing walls and an outdoor mini-golf course — the mix, in other words.

The problem was an open play court of more than five thousand square feet that was not earning what its floor was worth. The fix was not more space: four interactive, competitive attractions went into the trampolines along the back wall, and the flow of jumping was kept uninterrupted.

Their own words on the result: guests have four new games to play, the attractions are hits, and they create a draw for return visits. That is reinvestment working — and it is the argument for keeping a budget line for it rather than treating a park as finished on opening day.

What changed

Before
5,000+ sq ft of open play, under-used
After
Four interactive, competitive attractions in the same footprint
The case study

Reinvestment on this scale is a retrofit rather than a rebuild, and the other half of keeping a mixed park open is the dull half — inspection and maintenance, across eight or ten attractions that wear at different rates.

04 photographs

Adventure parks we have built

The next step

Send the building, get a line-item estimate

Footprint, ceiling height and opening target is enough to start. You get a priced scope, not a brochure.

Talk to somebody

864-477-1126Request an Estimate

Or send a floor plan and we will come back with a priced scope.