NOW PLANNING PARK PROJECTS FOR 2027

About

From the first call to the day you open

Six stages, in the order they happen. The same people carry a project through all of them, so nothing is handed to a vendor you then have to chase.

06 stages

How a project runs

  1. Discovery

    Building constraints, target guest, capacity goals and budget envelope on the table before any drawing.

  2. Design

    Custom layouts and 3D renders drawn around your building: columns, ceiling height, sprinklers and sightlines. You see the finished park before anything is built.

  3. Quote

    A line-item proposal you can take to a lender or a board, with no hidden install scope.

  4. Manufacture

    Fabrication in our own production process, with quality checks against certified standards.

  5. Install

    Our US install teams work to an agreed schedule, coordinated with your contractor and your opening date.

  6. Support

    Replacement parts, service visits and staff training from a US team that stays with you after opening.

The same at every stage

Three things that do not change

Where it is made
Manufactured in the USA and the UK, using high-quality, durable materials that meet or exceed safety standards.
When something wears out
A facility in Atlanta supplies replacement parts, to minimize downtime and keep the playground operating safely.
Who can use it
Inclusive and ADA-compliant options: ramps, transfer stations, ground-level activities and sensory-rich components.

Answered in full, along with cost and financing, on the FAQs.

The next step

Send the building, get a line-item estimate

Footprint, ceiling height and opening target is enough to start. You get a priced scope, not a brochure.

Talk to somebody

864-477-1126Request an Estimate

Or send a floor plan and we will come back with a priced scope.